![]() |
![]() |
KWAJEX Weekly Sounding SummaryClick on "Plot" to see the skew-T for the sounding or select "Data" to see the data in tabular form. N/S signifies that no sounding was launched at the given time and location. AOP denotes an aircraft operational period.
Soundings: September 10, 1999 (12-hourly)Use these links to find the image desired.
Soundings: September 11, 1999 (12-hourly)Use these links to find the image desired.
Soundings: September 12, 1999 (12-hourly)Use these links to find the image desired.
Soundings: September 13, 1999 (12-hourly)Use these links to find the image desired.
Soundings: September 14, 1999 (12-hourly)Use these links to find the image desired.
Soundings: September 15, 1999 (12-hourly)Use these links to find the image desired.
Scientific contacts: Professor Sandra Yuter, KWAJEX Project Science Coordinator; Professor Robert A. Houze, Jr.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
![]() |