2001 and 2002: |
Preparation for field campaigns, equipment and instrument acquisition. |
  |
January 2003: |
First field season. 32-meter tower erected at Dome C by Brandt and Six. Preliminary
BRDF measurements made by Brandt and Six. |
  |
February to November 2003: |
Testing and modification of instruments. |
  |
December 2003 and January 2004: |
Second field season. Measurements of snow transmission, albedo and BRDF by Brandt,
Grenfell, Hudson, Six, and Warren. |
  |
February to November 2004: |
Further testing and modification of instruments. Analysis of data from second field
season. |
  |
December 2004 and January 2005: |
Third field season. Measurements of snow transmission, albedo and BRDF by Brandt, Grenfell,
and Hudson. |
  |
February 2005 to present: |
Data analysis. |