- Enclosure completed by John Schulz
- Alarm donated and installed courtesy of David Holmes
- Hookup problem is being worked
- David Holmes is checking this week re installing an
	Internet accessible camera
- Display boards completed by Schulz and Tillman
- Display board materials partially completed by Tillman,
	& to be finished for review this week. They are beneath the
        paper covered plastic
- Some can be found at the
	``http://www.atmos.washington.edu/~mars/viking/lander/viking_lander/''
	site beginning with the ``Real time Downlink'' link. Please
	note, the Display version can be found at the bottom of the
	page, e.g., ``Display version at real_time.html''
- Some of these, such as the Real time Downlink'' do not
	have their final, higher quality illustrations
- Chizeck and Tillman agreed re lander raising.
- Suggested scenario
		
- Raise lander and attach legs; this weekend
- Install S-Band antenna and Meteorology Boom, but
	              not Chris's MSA model
- Cover or surround lander with opaque plastic
- Make descriptive labels for items such as Camera
	              Mounts, Biology, etc.
- Mount Viking and Pathfinder panorams and Viking
	              in Air & Space museum large photo, possibly
	              covering them
- Put supporting information in wall panels
		
 
- Schedule initial presentation; (before Christmas, 20, 21
              Dec?)
		
- Uncover lander
- Install Chris's Meteorology Sensor Assembly
- Have real one on hand for viewing on a table
	              inside enclosure
- Possibly have some other artifacts inside, such
	              as meteorology electronics
- Thank contributors
- Describe future
		
 
- Note that part of display panels will be reserved for
              student activities
- Describe LFEM - STEP program and goals
	
 
 
 
 
 
   